Environmental
protection
|
|
|
The implementation of the purposes in
correlation with the environmental
protection's regulations is a fundamental
factor in the investment process. It is also
a necessary condition when applying for EU
subsidies and funds.
The Environmental Impact Assessment of the
implemented measures has a profound basis in
the EU regulations especially in the EIA
directive as well as in the national law. As
an indispensable element in the investment
process, all the possible measures that may
affect the environment, determine the
possibilities and pace of the accomplishment
of the project. |
 |
|
|
|
We
offer:
1. the elaboration of the application for
issuance of a decision about environmental
conditionings:
-
screening of the measures' qualifications to the
EIA directive,
-
description of the data form,
-
gaining required map foundation,
-
monitoring the administrative process from the
point of view of the establishment of the
decision of environmental conditionings.
2. the elaboration of the reports about the
influence on the environment in the required sphere
by the administrative organ:
-
the analysis of the influence of emission of
noise and electromagnetic radiation,
-
the analysis of the influence of emission of
atmospheric pollution,
-
the analysis of water abstraction and sewage
disposal,
-
the analysis of waste economy,
-
the analysis of the influence on ornitofaunę –
ornithological monitoring (wind power stations)
-
the analysis of the influence on chiropterofaunę
(badanie chiropterologiczne – wind power
stations)
-
the analysis of the influence on the NATURE 2000
area, the habitat of fauna and flora species
protected by nature preservation regulations (infrastructural
measures, hydro-electric power station),
-
remaining analysis and research required by the
administrative organs.
3. the elaboration of the applications for issuance
of emission authorisation:
-
integrated permits (installations subject to
IPPC directive – Integrated Pollution Prevention
& Control),
-
pollution control permit,
-
manufacturing, recovery, transport and waste
collection permit,
-
wodnoprawne permit.
4. Ecological reviews:
-
ecological reviews for bailout application
needs,
-
ecological reviews resulting from administrative
decisions,
-
ecological reviews for the purpose of checking
the enterprise's functioning in the context of
the environmental protection regulations.
5. Constant service in the environmental protection
range:
-
calculation charges for the use of the
environment,
-
calculation product and deposit charges,
-
preparation of data sheet about waste economy by
required collective law.
In the purpose of reliable and efficient investment
service in the environmental protection sphere, we
cooperate with several specialists from the branch
and scientific environment. Our associates are very
experienced especially in the field of preparing the
documents for infrastructural measures (particularly
traffic), connected with renewable energy (wind
farms, small hydro-electric power stations) and also
in the field of investments favourable to the
improvement of the environmental protection.
Example accomplishments: |
|
ROADS
We
offer comprehensive service in the field of
preparation of the environmental documentation for
traffic investments, specifically including the
preparation of reports about the effect on the
environment of voivodship roads and highways. Our
actions include conducting complete analysis of the
influence of the investment:
-
on
natural environment (flora, fauna, landscape,
protected areas, NATURE 2000 areas),
-
acoustic climate (noise measurement, modelling
of acoustic nuisance, proposals of the
localisation of acoustic shields),
-
in
the field of pollution emission to the air,
-
in
the field of disposal of rainwater and thawing
snow waters,
-
remaining analysis required by local
administration and opinion organs.
We have gained our experience by cooperating while
preparation of the environmental documentation for
such roads:
-
motorways: S5, S3,
-
national roads: DK11, DK42, DK45, DK94, DK75,
-
voivodship roads: DW303, DW282, DW137, DW618,
DW463, DW719, DW724 and others,
-
district roads,
-
communal and local roads.
In the considerable part, financing these
investments has been supported by EU funds which
means that prepared documentation included national
and community requirements.
RENEWABLE ENERGY
Our
specialists have been working on the preparation of
several documents and reports about the influence of
wind farms and small hydro-electric power stations
on the environment.
-
The analysis of the acoustic effect as well as
in the scope of field emission and
electromagnetic radiation of power-line 2x110kV
of the length of 25km from Dunowo to Darłowo –
line operating wind farms in the area of
Darłowo,
-
The analysis of the acoustic effect as well as
in the scope of field emission and
electromagnetic radiation of transformer station
110/400kV Dunowo – station operating wind farms
in the area of Darłowo,
-
The analysis of the acoustic effect as well as
in the scope of field emission and
electromagnetic radiation of transformer station
PSE 400kV Dunowo – station launching the energy
from wind farms localised in the area of Darłowo
to public energy network,
-
The analysis of the acoustic effect as well as
in the scope of field emission and
electromagnetic radiation of Majewo wind farm
together with traffic and energy infrastructure
as well as transformer station 30/110kV – wind
farm of total power of 45MW,
-
The analysis of the acoustic effect as well as
in the scope of field emission and
electromagnetic radiation of Wiekowice wind farm
together with traffic and energy infrastructure
as well as transformer station 30/110kV – wind
farm of total power of 27.5MW,
-
The analysis of the acoustic effect as well as
in the scope of field emission and
electromagnetic radiation of Dobiesław wind farm
together with traffic and energy infrastructure
- wind farm of total power of 27.5MW,
-
The analysis of the acoustic effect as well as
in the scope of field emission and
electromagnetic radiation of Jeżyce wind farm
together with traffic and energy infrastructure
- wind farm of total power of 25MW,
-
ornithological monitoring together with natural
stocktaking in the area of projected P±gów
(Wilków commune)wind farm ,
-
ornithological monitoring together with natural
stocktaking in the area of projected Kostomłoty
wind farm,
-
ornithological monitoring together with natural
stocktaking in the area of projected Jankowice
Wielkie wind farm,
-
chiropterologiczne research for wind farm
including the construction of 98 wind farm with
the power of 1.8 – 2.3MW,
-
reports of the influence on the environment of
the investment connected with the construction
of 102 wind power station localised on the
territory of two voivodship (opolskie, łódzkie).
The
documents that have been prepared by us, have
already obtained positive opinion of Regional
Directors of Environmental Protection and the organs
conducting proceedings in the case of assessment on
the influence of environment as well as European
Investment Bank which will be financing part of the
investment
|
|
 |
|
|
 |
 |
|