deutsch >>  

 

 
 
 
 
 
 
 

Environmental protection

 
The implementation of the purposes in correlation with the environmental protection's regulations is a fundamental factor in the investment process. It is also a necessary condition when applying for EU subsidies and funds.
The Environmental Impact Assessment of the implemented measures has a profound basis in the EU regulations especially in the EIA directive as well as in the national law. As an indispensable element in the investment process, all the possible measures that may affect the environment, determine the possibilities and pace of the accomplishment of the project.
foto
 
We offer:

1. the elaboration of the application for issuance of a decision about environmental conditionings:
  • screening of the measures' qualifications to the EIA directive,
  • description of the data form,
  • gaining required map foundation,
  • monitoring the administrative process from the point of view of the establishment of the decision of environmental conditionings.

2. the elaboration of the reports about the influence on the environment in the required sphere by the administrative organ:

  • the analysis of the influence of emission of noise and electromagnetic radiation,
  • the analysis of the influence of emission of atmospheric pollution,
  • the analysis of water abstraction and sewage disposal,
  • the analysis of waste economy,
  • the analysis of the influence on ornitofaunę – ornithological monitoring (wind power stations)
  • the analysis of the influence on chiropterofaunę (badanie chiropterologiczne – wind power stations)
  • the analysis of the influence on the NATURE 2000 area, the habitat of fauna and flora species protected by nature preservation regulations (infrastructural measures, hydro-electric power station),
  • remaining analysis and research required by the administrative organs.

3. the elaboration of the applications for issuance of emission authorisation:

  • integrated permits (installations subject to IPPC directive – Integrated Pollution Prevention & Control),
  • pollution control permit,
  • manufacturing, recovery, transport and waste collection permit,
  • wodnoprawne permit.


4. Ecological reviews:

  • ecological reviews for bailout application needs,
  • ecological reviews resulting from administrative decisions,
  • ecological reviews for the purpose of checking the enterprise's functioning in the context of the environmental protection regulations.

5. Constant service in the environmental protection range:

  • calculation charges for the use of the environment,
  • calculation product and deposit charges,
  • preparation of data sheet about waste economy by required collective law.


In the purpose of reliable and efficient investment service in the environmental protection sphere, we cooperate with several specialists from the branch and scientific environment. Our associates are very experienced especially in the field of preparing the documents for infrastructural measures (particularly traffic), connected with renewable energy (wind farms, small hydro-electric power stations) and also in the field of investments favourable to the improvement of the environmental protection.


Example accomplishments:

ROADS

foto foto

We offer comprehensive service in the field of preparation of the environmental documentation for traffic investments, specifically including the preparation of reports about the effect on the environment of voivodship roads and highways. Our actions include conducting complete analysis of the influence of the investment:

  • on natural environment (flora, fauna, landscape, protected areas, NATURE 2000 areas),

  • acoustic climate (noise measurement, modelling of acoustic nuisance, proposals of the localisation of acoustic shields),

  • in the field of pollution emission to the air,

  • in the field of disposal of rainwater and thawing snow waters,

  • remaining analysis required by local administration and opinion organs.


We have gained our experience by cooperating while preparation of the environmental documentation for such roads:

  • motorways: S5, S3,

  • national roads: DK11, DK42, DK45, DK94, DK75,

  • voivodship roads: DW303, DW282, DW137, DW618, DW463, DW719, DW724 and others,

  • district roads,

  • communal and local roads.


In the considerable part, financing these investments has been supported by EU funds which means that prepared documentation included national and community requirements.

RENEWABLE ENERGY

foto foto

Our specialists have been working on the preparation of several documents and reports about the influence of wind farms and small hydro-electric power stations on the environment.

  • The analysis of the acoustic effect as well as in the scope of field emission and electromagnetic radiation of power-line 2x110kV of the length of 25km from Dunowo to Darłowo – line operating wind farms in the area of Darłowo,
     

  • The analysis of the acoustic effect as well as in the scope of field emission and electromagnetic radiation of transformer station 110/400kV Dunowo – station operating wind farms in the area of Darłowo,
     

  • The analysis of the acoustic effect as well as in the scope of field emission and electromagnetic radiation of transformer station PSE 400kV Dunowo – station launching the energy from wind farms localised in the area of Darłowo to public energy network,
     

  • The analysis of the acoustic effect as well as in the scope of field emission and electromagnetic radiation of Majewo wind farm together with traffic and energy infrastructure as well as transformer station 30/110kV – wind farm of total power of 45MW,
     

  • The analysis of the acoustic effect as well as in the scope of field emission and electromagnetic radiation of Wiekowice wind farm together with traffic and energy infrastructure as well as transformer station 30/110kV – wind farm of total power of 27.5MW,
     

  • The analysis of the acoustic effect as well as in the scope of field emission and electromagnetic radiation of Dobiesław wind farm together with traffic and energy infrastructure - wind farm of total power of 27.5MW,
     

  • The analysis of the acoustic effect as well as in the scope of field emission and electromagnetic radiation of Jeżyce wind farm together with traffic and energy infrastructure - wind farm of total power of 25MW,

  • ornithological monitoring together with natural stocktaking in the area of projected P±gów (Wilków commune)wind farm ,

  • ornithological monitoring together with natural stocktaking in the area of projected Kostomłoty wind farm,

  • ornithological monitoring together with natural stocktaking in the area of projected Jankowice Wielkie wind farm,

  • chiropterologiczne research for wind farm including the construction of 98 wind farm with the power of 1.8 – 2.3MW,

  • reports of the influence on the environment of the investment connected with the construction of 102 wind power station localised on the territory of two voivodship (opolskie, łódzkie).
     

The documents that have been prepared by us, have already obtained positive opinion of Regional Directors of Environmental Protection and the organs conducting proceedings in the case of assessment on the influence of environment as well as European Investment Bank which will be financing part of the investment

Copyright © ZAGA All rights reserved